The approach is exemplified by a use case of the reservation of a meet-ing room. The result is a generic, model-based, reusa-ble and extensible conceptual framework to incorporate FM data based within the three-dimensional model-based design and construction of an asset to enable smart applications, which are introduced. The Design Science Research approach is applied. It is therefore only possible to provide additional services and applications to the user, FM and the public with an increased expenditure of resources. ![]() Yet, the data currently available due to digital methods are mostly not structured or do not focus on the FM but on the shorter construction phase. Building owners are dependent on accurate data for the FM. ![]() This with the aim to enable further applications based on Building Information Modelling (BIM). ![]() The research gap consists of unspecified data and requirements at the beginning of a construc-tion project that a client has for the facility management (FM) phase of an asset to operate it efficiently and effectively.
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |